1

Advanced 400 kW Chiller Installation Achieves £50K Annual Cost Reduction on Energy and 200 Metric Tonnes CO₂ Cut

News Discuss 
Installation Overview At a prominent confectionery site in York, Newsome has commissioned a efficient 400 kW chiller, marking the successful conclusion of the project. Designed to advance ESG targets, the installation boosts system dependability while minimising overall power consumption and CO₂ levels. https://peakbookmarks.com/story20791625/high-efficiency-400-kw-chiller-installation-delivers-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story